Show/Hide

The City of Boulder welcomes your feedback. Use our Inquire Boulder customer service tool to tell us what’s on your mind.

  • Assistance
  • Rebuild and Restore
  • Recovery and Resilience
  • Creek Projects
  • Maps of Floodplains
  • Floodplain Development
  • Prepare for Floods
  • Protect Your Property
  • Respond to Floods

Boulder Slough Floodplain Mapping Study

The Boulder Slough is an irrigation channel that has historically carried flood overflows from Boulder Creek, downstream of Broadway. The Slough trends east‐northeast terminating at its confluence with Goose Creek east of Foothills Parkway. The Boulder Slough Mapping Study defines new flood zones for this area.

For more information about your property, flood zone definitions and frequently asked questions, please open the Boulder Slough Interactive Map by clicking the image below.

This is a link to the Boulder Slough Floodplain Mapping Study - Interactive Story Map.

 

 

 

 

 

 

 

 

 

 

City Council accepted the mapping study on Sept. 5, 2017. The mapping study will be submitted to FEMA for their review and adoption. The FEMA review and approval process is estimated to take 9-18 months. 

Project Background

Floodplain mapping studies provide the basis for flood management by identifying the areas subject to flooding. This information is essential for determining areas where human safety is threatened and property damage is likely. Floodplain maps must be updated periodically to reflect changes in the floodplain resulting from land development, flood mitigation improvements and new study technologies.

In 2013, the City completed a floodplain study for Boulder Creek to reflect the numerous changes authorized by City floodplain permits and update hydraulic models based on better, more detailed topographic information. The Boulder Creek floodplain study did not initially include the flow path for the Boulder Slough, but the upstream reach of the Boulder Slough was added to the Boulder Creek Study during the FEMA adoption process. 

The Lower Boulder Slough study includes hydraulic models and flood hazard mapping for the 100-year flood event and conveyance zone for the reach of Boulder Slough from approximately 300-feet downstream of 30 th Street to where the Slough confluences with Goose Creek, east of Foothills Parkway. Modeling and mapping of this reach, as well as split flow paths, utilizes 2013 Lidar-based topographic data.

Project Schedule and Next Steps

The floodplain study is being submitted to the Urban Drainage and Flood Control District (UDFCD) for inclusion in the FEMA Flood Insurance Rate Map. The UDFCD coordinates floodplain mapping revisions for FEMA within the District. During the UDFCD/FEMA review and approval process (estimated to be 9 to 18 months) the new mapping will be used for regulatory purposes.

For property-specific information about the land development requirements for all floodplain zones, contact Planning and Development Services at [email protected] or 303-441-1880.

Upper Boulder Slough Information

The Upper Boulder Slough Study includes the area from the Boulder Creek floodplain, approximately 100-feet downstream of 18th Street to approximately 300-feet downstream of 30th Street.  The Upper Boulder Slough Study was completed in 2015 and was incorporated into the Boulder Creek Floodplain Mapping Update
 
Past Events
  • City Council accepted the floodplain mapping study on Sept. 5, 2017. 
  • The WRAB unanimously recommended City Council approval of the new mapping at their July 17, 2017 meeting. View the Boulder Slough WRAB Memo pdf
  • was included as part of their May 15, 2017 meeting. 
  • Open House: March 20, 2017 4:30-5:30PM at the City's Municipal Services Center, 5050 Pearl St., Boulder, CO 80301

Sign Up for Email Updates

The City of Boulder will send you email updates about the Boulder Slough Floodplain Mapping Study.

View Full Site