Setbacks
Prior to framing inspection approval an updated ILC or ISP (depending on thresholds described above) may be needed to verify compliance with minimum setback requirements.
Solar/Bulk
Prior to framing inspection approval, those elements of the building near the maximum heights allowed for solar/bulk plane may require a height confirmation survey.
Floor Area Ratio (FAR)/Side Yard Wall Articulation (SYWA)
If, because of a partially exposed lower level, the resulting development on the property is near the maximum allowed FAR, or if proposed wall heights are near the maximum allowed for SYWA, a finished grade certification by a surveyor may be required prior to final inspection approval.
Overall Building Height
Prior to framing inspection approval a height verification survey may be needed to verify compliance with maximum allowable building height.