Contact Planning & Development Services

Phone

303-441-1880

Hours

Tue-Fri: 10:00 am to 4:00 pm

Mailing Address

City of Boulder, Attn: P&DS, P.O. Box 791, Boulder, CO 80306

Payment Types Accepted

Checks are accepted by mail, or may be dropped off at the New Britain Customer Service Hub: 1101 Arapahoe Ave, Boulder, CO 80301; Tues-Fri: 10:00am – 4:00pm.

Credit cards (Visa, Mastercard, Discover) and ACH/E-check payments are accepted on our website.

There is a 2.85% service fee for in office and online credit card payments.

Planning & Development Services Overview

The Planning and Development Department (P&DS) works to ensure the successful implementation of the City of Boulder’s planning and development needs including:

  • Building and Construction Permit Services
  • GIS Mapping and Property Information Services
  • Land Use and Engineering Review
  • Inspection and Licensing Services
  • Environmental and Zoning Enforcement
  • Long Range Planning and Historic Preservation

Building Permit Fees

The rates in effect at the time of application applies. Building permits are issued as a general permit. Electrical, mechanical and plumbing sub-contractor permits, and fees are required when associated with a general permit unless stated otherwise.

Building Permit Fee Section 4‑20‑4(c)(d)(e)

This fee is based on the value of the work covered by the permit. It shall be determined by either the City of Boulder Valuation Table (see pages 2-3) or the estimated value of the work covered by the permit provided by the applicant at time of application. The higher of the two valuations shall be used to calculate the building permit fees and the estimated pre-payment of construction use tax. The square foot construction costs in the City of Boulder Valuation Table are based on the August 2024 cost data as published by the International Code Council and will be updated on an annual basis. Construction materials are defined as materials that become an inseparable and integral part of a completed structure or project.

Fee is due at the time of permit issuance and is doubled on permits for work started or completed without an approved permit.

ValuationFees
$500.00 or less$25.00
$500.01 through $2,000.00$25.00 for the first $500.00 plus $3.25 for each additional $100.00 or fraction thereof, up to and including $2,000.00
$2,000.01 through $25,000.00$74.00 for the first $2,000.00 plus $14.95 for each additional $1,000.00 or fraction thereof, up to and including $25,000.00
$25,000.01 through $50,000.00$418.00 for the first $25,000.00 plus $10.75 for each additional $1,000.00 or fraction thereof, up to and including $50,000.00
$50,000.01 through $100,000.00$686.00 for the first $50,000.00 plus $7.45 for each additional $1,000.00 or fraction thereof, up to and including $100,000.00
$100,000.01 through $500,000.00$1,059.00 for the first $100,000.00 plus $5.95 for each additional $1,000.00 or fraction thereof, up to and including $500,000.00
$500,000.01 through $1,000,000.00$3,447.00 for the first $500,000.00 plus $5.05 for each additional $1,000.00 or fraction thereof, up to and including $1,000,000.00
$1,000,000.01 or more$5,979.00 for the first $1,000,000.00 plus $3.85 for each additional $1,000.00 or fraction thereof

City of Boulder Valuation Table (per square foot)

Scope Non-Residential Residential
Addition 100% 100%
Alteration 50% 50%
Core and Shell 75% 75%
New 100% 100%
Repair 50% 50%
Tenant Finish 50% 50%
Basement Finish N/A 50%
Unfinished Basement N/A $31.50 per square foot
Group Building Use Type of Construction
CodeTypeI-A I-B II-A II-B III-A III-B IV V-A V-B
A-1 Assembly Theater $306.63 $294.75 $285.24 $272.92 $253.47 $245.34 $262.66 $234.35 $224.35
A-2 Nightclub $264.07 $256.33 $248.28 $238.82 $223.69 $217.61 $230.62 $203.42 $195.71
Restaurant $263.07 $255.33 $246.28 $237.82 $221.69 $216.61 $229.62 $201.42 $194.71
A-3 Amusement/Recreational – Indoor $261.35 $249.47 $238.96 $227.64 $207.19 $200.06 $217.38 $188.07 $179.07

Library, Museum, Community

Hall

$261.35 $249.47 $238.96 $227.64 $207.19 $200.06 $217.38 $188.07 $179.07
Religious $311.21 $299.32 $289.82 $277.50 $258.18 $250.05 $267.24 $239.06 $229.06
A-4 Arena $305.63 $293.75 $283.24 $271.92 $251.47 $244.34 $261.66 $232.35 $223.35
A-5 Amusement/Recreational – Outdoor $305.63 $293.75 $283.24 $271.92 $251.47 $244.34 $261.66 $232.35 $223.35
B Business

Financial Institution,

Government Uses, Medical &

Dental Clinics, Office

(Administrative, Professional,

Technical), Personal Service,

Research & Development

$292.48 $282.09 $271.97 $260.46 $237.85 $229.40 $250.46 $212.56 $202.84
E Educational Schools/Educational $279.20 $269.50 $260.98 $250.17 $233.48 $221.55 $241.57 $204.55 $198.00
F-1

Factory &

Industrial

(moderate hazard)

Manufacturing-Moderate

Hazard, Service Industrial Moderate Hazard

$162.52 $154.68 $144.93 $139.48 $124.19 $118.17 $132.99 $102.98 $95.90
F-2

Factory &

Industrial (low hazard)

Manufacturing-Low Hazard,

Service Industrial-Low

Hazard, Public

Works/Utilities,

Telecommunications

$161.52 $153.68 $144.93 $138.48 $124.19 $117.17 $131.99 $102.98 $94.90
H-1 High Hazard High Hazard (explosive) $151.65 $143.81 $135.05 $128.61 $114.61 $107.60 $122.11 $93.40 N.P.
H-2 High Hazard (highly flammable) $151.65 $143.81 $135.05 $128.61 $114.61 $107.60 $122.11 $93.40 $85.33
H-3 High Hazard (flammable) $151.65 $143.81 $135.05 $128.61 $114.61 $107.60 $122.11 $93.40 $85.33
H-4 High Hazard (corrosive and/or toxic) $151.65 $143.81 $135.05 $128.61 $114.61 $107.60 $122.11 $93.40 $85.33
H-5 High Hazard (semiconductor type materials) $292.48 $282.09 $271.97 $260.46 $237.85 $229.40 $250.46 $212.56 $202.84
Group Building Use Type of Construction
I-A I-B II-A II-B III-A III-B IV V-A V-B
I-1 Institutional Assisted Living $264.93 $255.57 $246.84 $238.11 $217.64 $211.63 $238.15 $195.82 $189.67
I-2 Hospital $459.84 $449.45 $439.33 $427.82 $403.26 $0.00 $417.81 $377.98 N.P.
I-3 Nursing Home $319.21 $306.86 $296.74 $285.23 $264.10 $0.00 $275.22 $238.82 N.P.
Prison $341.48 $331.09 $320.97 $309.46 $288.34 $278.89 $299.46 $263.05 $251.33
I-4 Day Care $264.93 $255.57 $246.84 $238.11 $217.64 $211.63 $238.15 $195.82 $189.67
M Mercantile Commercial/Retail, Wholesale $197.08 $189.34 $177.79 $171.82 $156.33 $151.25 $163.63 $136.06 $129.35
R-1 Residential Boarding House $267.42 $258.06 $249.33 $240.60 $220.62 $214.60 $240.64 $198.79 $192.64
R-2 Motel/Hotel/Bed & Breakfast, Multifamily Dwellings $223.61 $214.25 $205.52 $196.79 $177.77 $171.76 $196.82 $155.95 $149.80
R-3

Accessory Dwelling Unit,

Mobile Home, Modular Home,

Single Family Attached

Dwelling, Single Family

Detached Dwelling, Studio,

Townhomes

$211.77 $205.84 $200.99 $197.13 $190.36 $183.32 $193.75 $177.67 $167.37
R-4 Residential Care $264.93 $255.57 $246.84 $238.11 $217.64 $211.63 $238.15 $195.82 $189.67
S-1

Storage

(moderate hazard)

Service Station/Vehicular

Repair, Warehousing-

Moderate Hazard

$150.65 $142.81 $133.05 $127.61 $112.61 $106.60 $121.11 $91.40 $84.33
S-2

Storage

(low hazard)

Parking Garage, WarehousingLow Hazard $149.65 $141.81 $133.05 $126.61 $112.61 $105.60 $120.11 $91.40 $83.33
U

Utility

(misc.)

Carport-Attached, CarportDetached, Deck, Patio Cover,

Porch

N.P. N.P. N.P. N.P. N.P. N.P. N.P. $34.05 $32.43
Garage-Attached, GarageDetached, Shed, Shop N.P. N.P. N.P. N.P. N.P. N.P. N.P. $68.09 $64.85
Spa, Swimming Pool $31.50 $31.50 $31.50 $31.50 $31.50 $31.50 $31.50 $31.50 $31.50

N.P. = not permitted

Energy Code Fee Section 4‑20‑4(f)8

This fee is for the review of new construction and additions to assure that the design complies with the International Energy Conservation Code. Fee is due at the time of permit issuance and is the rate in effect at the time of application.

PermitFee
Residential$83.90
Commercial$104.05

Plan Check Fee Section 4‑20‑4(f)7

This fee applies to building and sitework permits to assure that the design complies with all city codes. Fee is due at the time of application and is non‑refundable. The rate in effect at the time of application applies.

Initial Application

PermitRate
Single-family residential25% of building permit fee
Multifamily residential65% of building permit fee
Nonresidential65% of building permit fee

Compatible Development

RL-2 on lots >8,000 square feet that are not within a planned development, planned residential development, planned unit development, or an approved site review; or shown on Appendix H of Title 9, Land Use Code.)
PermitRate
Single-family residential (RR-1, RR-2, RE, RL-1, RMX-1)50% of building permit fee
Detached single-family residential 50% of building permit fee

Electrical Permit Fee Section 4‑20‑8

Fee is due at the time of permit issuance and is doubled on permits for work started or completed without an approved permit.

Residential

Fee is based on the enclosed living area of new, remodels, and additions to one‑and two‑unit dwellings and townhomes.

Square FeetFee
Less than 500 sf$36.70
500 sf through 999 sf$51.75
1,000 sf through 1,499 sf$69.60
1,500 sf through 1,999 sf$90.25
2,000 sf or more$90.25 plus $5.90 per 100 sf over 2,000 sf
PermitFee
Residential Service Change Only Fee$36.70
Mobile Homes$42.85 per space

Nonresidential and Multifamily

Fee is based on the total cost of the electrical installation, including labor and electrical materials.

Total CostFee
$300.00 or less$42.85
$300.01 through $3,000.00$50.90
$3,000.01 or more$19.60 per $1,000.00 of electrical valuation or fraction thereof

Photovoltaic System Permit Fee
PermitFee
Residential$69.60
Nonresidential and Multifamily$139.20
PermitFee
Temporary Construction Power Permit$36.40, no tax

Mechanical Permit Fee Section 4‑20‑13

Fee is based on the value of the mechanical materials and labor to building the structure and is due at time of permit issuance. This fee is doubled on permits for work started or completed without an approved permit.

Value of Materials and LaborFee
$100.00 or less$13.60
$100.01 through $400.00$16.75
$400.01 through $800.00$19.90
$800.01 and above$19.90 for the first $800.00 plus $3.75 for each additional $100.00 or fraction thereof

Solar Thermal System

PermitFee
Residential$69.60
Nonresidential and Multifamily$139.20

Plumbing Code Fee Section 4‑20‑15(b)

Fee is due at the time of permit issuance. This fee is doubled on permits for work started or completed without an approved permit. Additional fees may apply. Refer to the Utility Fees section for additional information.

Residential

For new construction, the fee is based on the number of bathrooms and/or dwelling units. Please note that a roughed‑in bathroom constitutes a bathroom.

New Construction Fee
One dwelling unit structures (1½ baths or less)$68.85
One dwelling unit structures (2 to 3½ baths)$94.00
One dwelling unit structures (4 or more baths)$119.15
Two dwelling unit structures$111.75
Three to fifteen dwelling unit structures$42.25 per unit
Sixteen to thirty dwelling unit structures$38.90 per unit
Structures containing more than 30 dwelling units$34.20 per unit
Remodel and Addition Fee
One dwelling unit$34.20
Two or more dwelling unitsBased on plumbing valuation (see commercial)

Nonresidential

Fees shall be computed based on the total dollar value of the complete plumbing installation including materials, fixtures and all installation costs, as follows:

Commercial, Industrial and MiscellaneousFee
$100.00 or less$13.60
$100.01 through $400.00$16.75
$400.01 through $800.00$19.90
$800.01 or more$19.90 for the first $800.00 plus $3.75 for each additional $100.00 or fraction thereof

Demolition Permit Fee Section 4‑20‑4(f)1

This fee is due at the time of permit issuance and is doubled on permits for work started or completed without an approved permit. Additional fees apply for buildings over fifty years old. Refer to the Historic Preservation Application Fees section.

PermitFee
Interior non-load bearing$24.55, no tax
All other$173.70, no tax

4-20-72. - Construction and Demolition Deposit Administrative Fee

An applicant for a building or demolition permit which requires a deposit under section 3601.2.3 of the City of Boulder Building code or section R328.2.3 of the City of Boulder Residential Code shall pay an administrative fee of $219.

Grading Plan Review and Permit Fees Section 4‑20‑4(f)14

Fee is based on the volume of cut and fill material associated with the project and is due at the time of permit issuance. The Grading Permit Fee is doubled on permits for work started or completed without an approved permit.

Grading Plan Review Fee

Volume of materialFee
50 cubic yards or lessNo fee
51 through 100 cubic yards$18.65
101 through 1,000 cubic yards$28.00
1,001 through 10,000 cubic yards$37.30
10,001 through 100,000 cubic yards$37.30 for the first 10,000 cubic yards plus $18.65 for each additional 10,000 cubic yards or fraction thereof
100,001 through 200,000 cubic yards$205.60 for the first 100,000 cubic yards plus $11.15 for each additional 10,000 cubic yards or fraction thereof
200,001 cubic yards or more$317.45 for the first 200,000 cubic yards plus $5.55 for each additional 10,000 cubic yards or fraction thereof

Additional plan review required by changes, additions, or revisions to the approved plans is $51.30 per hour with a minimum of one-half hour.

Grading Permit Fee

Volume of MaterialsFee
50 cubic yards and less$18.65
51 through 100 cubic yards$28.00
101 through 1,000 cubic yards$28.00 for the first 100 cubic yards plus $12.60 for each additional 100 cubic yards or fraction thereof
1,001 through 10,000 cubic yards$145.70 for the first 1,000 cubic yards plus $11.15 for each additional 1,000 cubic yards or fraction thereof
10,001 through 100,000 cubic yards$246.50 for the first 10,000 cubic yards plus $50.25 for each additional 10,000 cubic yards or fraction thereof
100,001 cubic yards and greater$700.30 for the first 100,000 cubic yards plus $28.00 for each additional 100,000 cubic yards or fraction thereof

Sign Permit Fee Section 4‑20‑21(b)

Fee is based on the type of sign and is due at the time of application. Sales tax is due on valuation of the sign at time of application. This fee is doubled on permits for work started or completed without an approved permit.

Type of SignFee
Signs not requiring plan check or electrical review and inspection$92.00
Signs not requiring plan check but including electrical review and inspection$178.00
Signs requiring plan check but not including electrical review and inspection$252.00
Signs requiring plan check and including electrical review and inspection$344.00

Fence and Retaining Wall Permit Fee Section 4‑20‑4(f)2

  • $4.05 for each $100.00 of valuation

Fee is based on the total cost of the fence installation, including labor and materials. This fee is paid at the time of permit issuance, and is doubled on permits for work started or completed without an approved permit.

Fire Systems Permit Fees Section 4‑20‑52(c)

For fire suppression, sprinkler systems, and hoods, the Mechanical Permit Fee schedule applies. For fire alarm detection systems, the Building Permit Fee schedule applies per the applicant’s valuation.

Gasoline Tank Installation Fee Section 4‑20‑4(f)12

  • $69.54.

This fee is paid at time of permit issuance.

House Moving Permit Fee Section 4‑20‑4(f)13

  • $58.50, no tax.

This fee is paid at the time of permit issuance.

Mobile Home Installation Permit Fee Section 4‑20‑14(b)

  • $58.10, no tax.

This fee applies to tie‑down, blocking, and other structural installations, and is paid at time of permit issuance.

Roofing Permit Fee

The Building Permit Fee schedule applies per the applicant’s valuation.

Siding Permit Fee

The Building Permit Fee schedule applies per the applicant’s valuation.

Sitework Plan Check and Permit Fees

The Building Permit Fee and Plan Check Fee schedules apply per the applicant’s valuation.

Temporary Event Permit Fee Section 4‑20‑4(f)3

  • $28.05, no tax.

This fee is due at the time of permit issuance. An Administrative Review Application must be submitted and approved prior to permit application.

Woodstove Permit Fee

The Building Permit Fee schedule applies per the applicant’s valuation.

Other Building Permit Fees

Change of Use Fee Section 4-20-4(f)5

  • $81.00

This fee is for the change of use analysis and is due at the time of the request. This fee may be credited to the Building Permit Fee if the permit application and issuance occur within ninety days.

Reinstatement of Permit Fee Section 4-20-4(f)(9)

This fee is fifty percent of the Building Permit Fee. In addition, the Energy Code Fee may be charged if additional review is required.

Replacement of Lost Plans/New Red Lines Fee Section 4‑20‑4(f)(11)
PlansFee
Residential or Tenant Finish$116.60 plus reproduction costs and sales tax
New Commercial$347.60 plus reproduction costs and sales tax

Temporary Certificate of Occupancy Fee Section 4-20-4(f)10
  • $173.70

Inspection Fees Section 4-20-4(f)(4)(6)

InspectionFee
After-Hours Inspection Fee$123.00 per hour, two hour minimum
Reinspection Fee $94.00 per occurrence

Fee is due before any other inspections may be performed.

Sales and Use Tax Section 3-2-5 and Section 3-17-6

City and county sales and use taxes are paid on building and right-of-way permits at the time of permit issuance and are a pre-payment estimate based on the construction material valuation of the work covered by the permit. For a building permit, material valuation is estimated at fifty percent of the total valuation. For a right-of-way or grading permit, material valuation is estimated at thirty percent of the total valuation. The tax rate in effect at the time of application applies. An applicant is exempt from city and county taxes on the construction materials associated with the permit at vendors throughout Colorado upon purchasing the permit. Contractors and homeowners acting as their own contractor may be required to reconcile the pre-payment of estimated Construction Use Taxes with actual taxes due based on the final contract price or final project cost. Please refer to the city’s website for additional information: Construction Use Tax.

TaxPercent
City of Boulder Sales and Use Tax3.860%
Boulder County Sale and Use Tax 1.185%

Sales tax is collected on publications and water/wastewater taps and meters.

TaxPercent
Total Sales Tax9.045%

Excise Taxes Section 3‑8‑3

Development Excise Taxes fund the cost of future capital improvements.

Development Excise Taxes are assessed on new residential and nonresidential development and nonresidential additions. Excise taxes are paid prior to final inspection for new construction, or at the time of permit issuance for all other types of construction. The tax rate in effect at the time of application applies.

Tax NameNonresidentialResidential
Per Square Foot

Per Detached

Dwelling Unit

Per Attached Dwelling Unit or Mobile Home
Development Excise Tax
Transportation$2.48$4,690.21$3,402.82

Capital Facility Impact Fees Section 4-20-62

Capital facility impact fees will be collected for capital improvements to serve new development. Residential development will be charged impact fees based on unit size. Residential additions will be charged on net additional square footage. Non-residential development will be charged impact fees based on square footage by type of use. Redevelopment will be charged for net new square footage and a change of use. Capital facility impact fees are paid prior to final inspection for new construction, or at the time of permit issuance for all other types of construction. The tax rate in effect at the time of application applies.

Residential Impact Fee Rates per Dwelling Unit

Square FeetParks & RecreationHuman ServicesMunicipal FacilitiesPoliceFireTrans-portationTOTAL
799 and below$3,292 $100 $321 $266 $240 $120 $4,339
800-999$4,134 $125 $406 $335 $300 $157 $5,457
1000-1199$4,781 $148 $468 $388 $347 $181 $6,313
1200-1399$5,314 $164 $519 $432 $384 $201 $7,014
1400-1599$5,764 $178 $563 $470 $419 $222 $7,616
1600-1799$6,160 $189 $603 $503 $446 $237 $8,138
1800-1999$6,523 $199 $637 $531 $474 $251 $8,615
2000-2199$6,805 $208 $667 $555 $495 $262 $8,992
2200-2399$7,087 $219 $692 $577 $514 $274 $9,363
2400-2599$7,341 $227 $717 $599 $533 $284 $9,701
2600-2799$7,596 $234 $743 $618 $553 $293 $10,037
2800-2999$7,817 $241 $765 $636 $568 $302 $10,329
3000-3199$8,013 $247 $784 $655 $581 $310 $10,590
3200-3399$8,185 $252 $799 $668 $596 $317 $10,817
3400-3599$8,379 $258 $819 $684 $608 $325 $11,073
3600 and above$8,550 $262 $834 $695 $620 $331 $11,292

Nonresidential Impact Fee Rates

Impact Fee Rates Per Square Foot of Nonresidential Floor Area
Municipal FacilitiesPoliceFireAffordable HousingTrans-portationTOTAL
Nonresidential UsesRetail / Restaurant$0.47$0.87$0.75$23.05$0.66$25.80
Office$0.68$0.35$1.08$34.57$0.27$36.95
Hospital$0.56$0.41$0.87$23.05$0.33$25.22
Institutional$0.15$0.29$0.23$11.52$0.22$12.41
Warehousing$0.17$0.11$0.28$11.52$0.09$12.17
Light Industrial$0.44$0.21$0.69$20.16$0.17$21.67

Impact Fee Rates for Other Nonresidential Uses

Based on Unique Demand Indicators

Municipal FacilitiesPoliceFireAffordable HousingTrans-portationTOTAL
Other Nonresidential UsesNursing Home/ Assisted Living (per bed)$161.07$85.49$252.75$1,982.34$68.14$2,549.79

Lodging

(per room)

$109.03$257.70$172.22$5,947.03$204.43$6,690.41

Public & Civic Uses and Affordable Commercial Uses Impact Fee Rates

Impact Fee Rates Per Square Foot of Nonresidential Floor Area
Municipal FacilitiesPoliceFireAffordable HousingTrans-portationTOTAL

Public and Civic

Uses and

Affordable

Commercial Uses

Retail / Restaurant$0.47$0.87$0.75$9.91$0.66$12.66
Office$0.68$0.35$1.08$14.87$0.27$17.25
Hospital$0.56$0.41$0.87$9.91$0.33$12.08
Institutional$0.15$0.29$0.23$4.96$0.22$5.85
Warehousing$0.17$0.11$0.28$4.96$0.09$5.61
Light Industrial$0.44$0.21$0.69$8.67$0.17$10.18

Wetland Development Fees Section 4-20-53

This fee is required when requesting to build within a wetland area, and is due at the time of application.

UseConditional Permit FeeStandard Permit Fee
Buildings and Additions$85.00$2,000.00
Other Structures$170.00$1,400.00
Pavement, Surfaces and Trails$340.00$1,400.00
Landscaping and Landscape Maintenance$340.00$1,400.00
Stream Channel and Flood Improvements$340.00$2,000.00
Minor Revision$50.00$250.00
Major Revision $500.00
ServiceFee
Mitigation Plan Monitoring$650.00 per year of warranty
Boundary Determination$650.00 plus city’s direct cost for consultant
Functional Evaluation – Initial Request$700.00
Functional Evaluation – Final Application $3,500.00 plus city’s direct cost for consultant

Floodplain Development Fees Section 4-20-44

Fees are due at the time of application. Refer to Section 9-3-2, Section 9-3-6(b)(3), and Section 9-16-1(c) for additional information.

Floodplain Permit FeeInitial Application
For Development Not Located within the High Hazard or Conveyance Zone
Fence Flood Permit Construction of a fence$35.00
Accessory/Remodel Construction of a shed, garage, or deck, or for interior rehabilitation of an existing structure not requiring elevation or flood proofing$85.00
Non-substantial Modification/Addition Additions or improvements to an existing structure, not meeting the thresholds of substantial improvement or modification, which does not require flood proofing$350.00
Substantial Improvements/Elevated Construction of a new single family detached residential, attached residential, commercial, or mixed use structure or work on an existing structure exceeding the threshold of substantial damage, substantial improvement or substantial modification which require elevation $700.00
Floodproofed Structure Construction of a new structure, addition to an existing structure, substantial improvement, or substantial modification which require floodproofing$3,675.00
For Development Located within the Conveyance Zone or the Floodway
Floodplain Review without Analysis Floodplain analysis is not required$700.00
Floodplain Review with Analysis Floodplain analysis is required$3,600.00
Review of Emergency Management Plans
Emergency Operations Plan/Evacuation Emergency operations for an evacuation plan$700.00
Emergency Operations Plan/Shelter Emergency operations for a shelter in place plan$1,400.00
Hazmat Plan Hazardous materials facility plan for containment of hazardous materials$700.00
Map Revisions
Flood Map revision not in Floodway Map revision that involves fill$700.00
Flood Map Revision Floodway Map revision that includes a floodplain analysis$3,600.00
Fee is for a variance request from the floodplain regulation provisions.
RequestFee
Floodplain Variance Request Fee $1,400.00

RequestFee
Floodplain Permit and Variance Review of Revisions25% of initial application fee
Floodplain Information Request Fee$28.00 per address

Building Contractor License Fee

Fee is due upon application and at annual renewal. Fee cannot be prorated.

General Contractor Section 4-20-4(a)/4-20-14(a)
Class AAny type of construction under the International Building Code$460.00
Class BConstruction of Types V, V-A, IV, II-B, III-B$307.00
Class CConstruction of R-2 and R-3 occupancies of two stories or less$197.00
Class DSingle trade license as defined below:
D-1Moving or wrecking of structures$153.00
D-2Roofing$153.00
D-3Siding$153.00
D-4Landscaping, irrigation, and sitework$153.00
D-5Detached one-story garage and sheds accessory to single family dwellings$153.00
D-6Mobile home installer$153.00
D-7Elevator and escalator installer$153.00
D-8Class not identified above but requiring a building permit and inspection$153.00
D-9Rental housing inspector$15.00
Class EFences of any size or value and minor structures valued at less than $2,000.00 and are 200 square feet or less$75.00
Class FRepair licensee’s own building valued less than $500.00 is not load bearing, and does not include electrical, mechanical, or plumbing work.No fee
Class GEnergy Efficiency Inspector$15.00
Electrical Contractor
Section 4-20-8
No fee
Expert Cooperative Housing Organization (ECHO)
Section 10-11-14 (b)
$15.00
Fire Systems Contractor
Section 4-20-56
Class AFire sprinkler systems$307.00
Class BHood extinguishing systems$180.00
Class CFire alarm systems$180.00
Class DSpecial hazard systems$180.00
Class EPortable fire extinguishers$90.00
Mechanical Contractor
Section 4-20-13
Class AAny type of construction under the IMC and IFGC$253.50
Class BCommercial and dwelling units except work associated with IMC Sections 507 and 508, and occupancies “H” and “I”$127.25
Class COne and two family dwellings associated with the IRC$127.25
Class DSections 507 and 508 of the IMC$127.25
Class EBoiler, water heaters, and hydronics as defined in the IMC and IFGC$63.50
Plumbing Contractor
Section 4-20-15
$278.95
Right-of-Way Contractor
Section 4-20-6
$201.00
Sign Contractor
Section 4-20-21
Class AManufacturer or installer of signs and related structures including awnings and canvas canopies$332.90
Class BCreator of painted signs$174.05
Tree Contractor
Section 4-20-65
$125.00

Right-of-Way Permit Fees Section 4-20-6, Section 4-20-23 and Section 4-20-27

All Right-of-Way Permits require payment of a permit fee plus additional fees for services and inspections. Fees are due at the time of permit issuance, and are doubled on permits for work started or completed without an approved permit. The fee rate in effect at the time of application applies. Sales and use tax is collected on permits where city infrastructure will be repaired or replaced. Refer to the Sales and Use Taxes section for additional information.

Right-of-Way PermitFee
City infrastructure $84.50
Non-city infrastructure including gas, electric, and telecommunications$137.50

Right-of-Way Inspection and TestingFee
Sidewalks, Trails, and Bike paths$81.50 first 50 lf, $0.97 each additional lf
Curbwalk and Curb and Gutter$81.50 first 50 lf, $0.97 each additional lf
Trenching$81.50 first 100 lf, $0.75 each additional lf
Pipeline (water, sewer, stormwater)$81.50 first 100 lf, $0.75 each additional lf
Concrete/Asphalt Paving
New or Overlay$122.00 first 300 sy, $0.35 each additional sy
Patch or Repair$122.00 first 300 sf, $0.35 each additional sf
Pavement Cut Impact Fee$3.85 per sf of pavement less than three years old
Miscellaneous Concrete, Masonry, or Stonework (including retaining walls, box culverts, wing walls, drop structures, etc.)$20.50 per cubic yard, $205.00 minimum
Appurtenances
Maintenance Hole$122.00 each
Fire Hydrant$81.50 each
Valve and Valve Box$81.50 each
Fitting (bend, tee, cross, etc.)$40.50 each
Inlet$122.00 each
Service Line Stub$81.50 each
Kick Block$40.50 each
Meter Pit
¾ inch to 1 inch$40.50 each
1½ inches to 2 inches$61.00 each
3 inches and larger$81.50 each
Private Utility Appurtenances$40.50 for the first three, $11.80 for each additional
Main Extension Fee$326.00 each
Water Quality Facility/Detention Pond Fee$718.00 per facility
Stormwater Connection
Permit Fee$127.00 per connection
Inspection Fee$169.00 for first two, $94.00 for each additional
Air Test (applies to sewer mains)$0.35 per lineal foot, $105.00 minimum (300 feet)
TV Test (applies to sewer and storm mains)$0.25 per lineal foot, $95.00 minimum (380 feet)
Clear Water Test Fee$243.00 each
Reinspection Fee$94.00 per hour, one-hour minimum
After-Hours Inspection Fee$123.00 per hour, two-hour minimum

Other Right-of-Way Permit Fee
Colorado Department of Transportation Utility Permit Fee $67.50
Erosion Control/Stormwater Management Plan Fee$592.00 per month
Temporary Equipment or Materials Storage Fee$81.50 per month for each item
Traffic Control Fee
One day or lessNo fee
One week or less$169.00 per week
Greater than one week$338.00 per month

Revocable Right-of-Way Permit and Lease Fees Section 4-20-11(a) and Section 4-20-20

The Initial Review Fee is non-refundable. Permits and leases must be renewed every three years. Applications for other encroachments not covered by this section will be reviewed and assessed a fee on a case-by-case basis.

Revocable Right-of-Way PermitFee
Initial Application Fee $650.00
Resubmittal Fee (within four weeks of initial application) $325.00
Renewal Fee$113.00

Revocable Right-of-Way LeaseFee
Initial Application Fee$750.00
Resubmittal Fee (within four weeks of initial application) $375.00
Renewal Fee$150.00

Annual LeaseFee
Encroachment on Pearl Street Mall$21.15 per square foot of leased area
Encroachment off the Pearl Street Mall$14.80 per square foot of leased area
Encroachment for P2P Telecommunication Conduit Crossings$21.20 per lineal foot of conduit crossing

Annual FeesFee
Annual Fee for Residential Encroachments $100.00
Annual Fee for Monitoring Wells $530.00 per well

Encroachment InvestigationFee
Residential$708.00
Nonresidential$1,415.00

Utility Fees

These fees apply to services related to utility work – including water, wastewater, and flood control – on private property. Fees are due at the time of permit issuance. Additional fees apply for work in the public right‑of‑way. Refer to the Right‑of‑Way Permit Fees section.

Front Foot Assessments

Many properties have outstanding utility assessments that are due to the City of Boulder or the original installer of a utility line at the time of annexation, subdivision, redevelopment, building permit issuance, or connection, whichever occurs first.

Outside City Utilities

Connection of properties outside the City of Boulder limits requires a separate
Land Use Review approval. City right‑of‑way permit fees related to restoration are not applicable in right‑of‑way owned by Boulder County.

Water, Irrigation, and Fire Line Permit Fees

Sections 4‑20‑23

Fees are for service connections and replacements

PermitFee
Residential$127.00
Nonresidential$169.00
Private property repair (Water and Irrigation Permits only)$42.00

InspectionFee
Residential, first two inspections$169.00
Nonresidential, first two inspections$211.00
Each additional inspection$94.00

Fire Line PermitsFee
Clear Water Testing Fee$243.00

Water Meter Material and Installation Fees Section 4‑20‑23(D)

Additional fees apply for meter pits. Refer to the Right‑of‑Way Permit Fees section for additional information. Individual components including yokes, meters, transponders and related equipment may be purchased according to the fees listed in Section 4‑20‑23.

Meter SizeLabor and EquipmentMaterialsSubtotalSales TaxTotal Fee
¾” $ 98.00 $ 439.00 $ 537.00 $ 39.71 $ 576.71
1” $ 98.00 $ 585.00 $ 683.00 $ 52.91 $ 735.91
1½” domestic $ 182.00 $ 937.00 $ 1,119.00 $ 84.75 $ 1,203.75
1½” sprinkler $ 182.00 $ 937.00 $ 1,119.00 $ 84.75 $ 1,203.75
2” domestic $ 182.00 $ 1,293.00 $ 1,475.00 $ 116.95 $ 1,591.95
2” sprinkler $ 182.00 $ 1,293.00 $ 1,475.00 $ 116.95 $ 1,591.95
3” domestic $ 265.00 $ 2,097.00 $ 2,362.00 $ 189.67 $ 2,551.67
3” sprinkler $ 265.00 $ 2,097.00 $ 2,362.00 $ 189.67 $ 2,551.67
4” domestic $ 266.00 $ 2,747.00 $ 3,013.00 $ 248.47 $ 3,261.47
4” sprinkler $ 266.00 $ 2,747.00 $ 3,013.00 $ 248.47 $ 3,261.47

This fee applies if the site is not ready for install.
Water Meter Call BackFee
¾” and 1”$99.00
1 ½” and 2”$182.0


Water Tap Fees Section 4‑20‑23(E)

The contractor is responsible for providing materials for all taps.

Tap Size Pipe MaterialTotal Fee
¾” in DIP/CIP$237.00
¾” in AC/PVC$237.00
1” in DIP/CIP$289.00
1in AC/PVC$289.00
1½” $381.00
2” $381.00
4” $583.00
6” $641.00
8” $724.00
12” $1,133.00

This fee applies if the site is not ready for the tap.
Water Tap Call BackFee
Water Tap Call Back Fee $312.00

Wastewater Permit Fees Section 4‑20‑27

Wastewater PermitFee
Residential$127.00
Nonresidential$169.00
Private property repair$42.00

Wastewater InspectionFee
Residential, first two inspections$169.00
Nonresidential, first two inspections$211.00
Each additional inspection$94.00


Wastewater Tap Fees Section 4-20-27(C)

Tap SizePipe MaterialTotal Fee
4”PVC/VCP$238.00
4”RCP$430.00
6”PVC/VCP$295.00
6”RCP$430.00
Manhole tap (8” or larger)$961.00

This fee applies if the site is not ready for the tap.
Call BackFee
Wastewater Tap Call Back$238.00

Plant Investment Fees

Sections 4-20-26, 4-20-29 and 4-20-46

General Information

Plant Investment Fees (PIFs) are for water, wastewater, and stormwater utilities and are charged to utilize existing infrastructure systems. PIFs are paid prior to final inspection for new construction, or at the time of permit issuance for all other types of construction. The fee rate in effect at the time of application applies.

Credits

Existing residential units or metered commercial facilities approved as part of a previous permit are credited at current plant investment fee rates.

Efficiency Standard

All nonresidential or mixed use customers can opt to choose the efficiency standard to establish a custom water budget. The PIF will be determined at that time. Visit Water Budgets Explained for details.

Large User Agreements

Nonresidential users requiring a water meter larger than two inches, or water use that exceeds the limits described in Section 11-1-52(j), or wastewater discharge that exceeds limits described in Section 11-2-33(j) will require a special agreement with the city and will be subject to large user fees specified in Section 4-20-26 (a) (5) and/or 4-20-29 (a) (4).

Mixed Use Developments

Developments with combined residential and nonresidential uses in the same structure shall pay a plant investment fee based on the individual uses within the structure.

Water PIFs are charged when an increase in demand is placed on the city’s existing water system. The PIFs are based on both an indoor and an outdoor component (except for irrigation-only services, which only have an outdoor component). See Table I for details by customer type. Existing customers who are increasing their demand on the system due to a remodel or an addition may or may not require a PIF payment. Please see the “Plant Investment Fee Worksheet” for details.

TABLE I: Water PIF Payment

Based on Customer Type
Customer TypeOutdoor ComponentIndoor Component
New Single-family Residential $3.53 per square foot (s.f.) of irrigation area for first 5,000 s.f.; $2.94 per s.f. for next 9,000 s.f.; $2.36 over 14,000 s.f. (2,000 s.f. min.)$12,957.00
New Multi-family Residential See Separate Irrigation-Only Service1 or 2 bed-room unit3 bedroom unit4 bedroom unit

5 or more

bedroom unit

$8,639.00

per unit

$10,798.00

per unit

$12,957.00

per unit

$15,116.00

per unit

Commercial, Industrial, InstitutionalSee Separate Irrigation-Only ServiceSee chart below to select meter size and annual water use (average winter consumption – AWC)
Irrigation-Only Service$3.53 per square foot of irrigation area (2,000 s.f. min.)N/A

Commercial, industrial and institutional customers must determine the appropriate meter size and select an annual water budget as shown in Table II. Each meter size and water budget (percent of AWC) correlates to a specific PIF payment as shown in Table III. A customer may select a smaller water budget and pay less in PIFs; however, if a customer goes over their monthly water budget, they will pay more in their monthly utility bills. Water usage other than listed below may be evaluated and assessed a proportional PIF on a case by case basis.

TABLE II: Annual Water Budget

Based on Average Winter Consumption (AWC) (gallons)
Meter Size25% AWC50% AWC85% AWC
¾”N/A30,000165,000
1”42,000108,000503,000
1-1/2”99,000228,000924,000
2”183,000483,0001,941,000

TABLE III: Water PIF Payment

Based on Percent of AWC (water budget)
Meter Size25%50%85%
¾”N/A$5,400$29,691
1” $7,561 $19,434 $90,517
1-1/2” $17,814 $41,029 $166,277
2” $32,931 $86,919 $349,288

Wastewater PIFs are charged when an increase in demand is placed on the city’s existing wastewater (sanitary sewer) system. See Table IV for details by customer type. Existing customers who are increasing their demand on the system due to a remodel or an addition may or may not require a PIF payment. Please see the “Plant Investment Fee Worksheet” for details.

TABLE IV: Wastewater PIF Payment

Based on Customer Type
Customer TypeNew Fee
New Single-family Residential $5,055.00
New Multi-family Residential 1 or 2 bedroom unit3 bedroom unit4 bedroom unit5 or more bedroom unit
$3,369.00 per unit$3,853.00 per unit$5,055.00 per unit$5,896.00 per unit
Commercial, Industrial, Institutional

See chart below to select meter size and annual water

use (average winter consumption – AWC)

Commercial, industrial and institutional customers must determine the appropriate meter size and select an annual water budget as shown in Table II. Each meter size and water budget (percent of AWC) correlates to a specific wastewater PIF payment as shown in Table V. A customer may select a smaller water budget and pay less in PIFs; however, if a customer goes over their monthly water budget, they will pay more in their monthly utility bills.

TABLE V: Wastewater PIF Payment

Based on Percent of AWC (water budget)
Meter Size25%50%85%
¾”N/A$2,106.00$11,581.00
1” $2,947.00 $7,606.00 $35,306.00
1-1/2” $6,950.00 $16,004.00 $64,858.00
2” $12,846.00$33,902.00 $136,242.00

Stormwater and Flood Management Utility PIFs

Section 4-20-46

This fee applies to any customer increasing their impervious, (hardscape), area and is calculated based on the square feet of additional impervious area. However, if new storm water detention facilities are built by the owner according to the most current City of Boulder Design and Construction Standards in effect at the time the building permit application is submitted, on or after April 2, 2009, the applicable fee shall be reduced by 50 percent.

Customer TypeNew Fee
All customers adding impervious (hardscape) area$2.71 per square foot of impervious area

Development Review Application Fees

Development review fees are due at the time of application. In addition, some Technical Document Review and Land Use Review applications are billed hourly following issuance of the initial comments. Refer to the Acknowledgement of Obligation form for additional information.

The application fee in effect at the time of application applies; the hourly billing rate in effect at the time of services rendered applies. Reapplication fees are listed in Section 4‑20‑43.

Technical Document Review Application Fees Section 4-20-43(a)(b)(c)

1 Additional Reviews Fee does not apply.
Type of ReviewInitial Application Fee – Includes Three ReviewsEach Additional Review After Three
Final Plans
Final Architecture, Landscaping, and Site Plan combined (only applies to the Simple Site Review)$1,540.00

$510.00

Final Architecture Plan$1,230.00$410.00
Final Landscaping Plan$1,230.00$410.00
Final Site Plan$1,230.00$410.00
Subdivision
Subdivision Agreement/Final Plat
Standard$3,860.00$1,270.00
Complex$6,170.00$2,040.00
Lot Line Adjustment$1,160.00$380.00
Lot Line Elimination$690.00$230.00
Engineering Review
Colorado Department of Transportation Access Permit1$630.00N/A
Stormwater Plan and Report Review
Simple$770.00$250.00
Standard$3,090.00$1,020.00
Complex$6,170.00$2,040.00
Transportation
Simple$770.00$250.00
Standard$3,090.00$1,020.00
Complex$6,170.00$2,040.00
Utility Plan Review
Simple$770.00$250.00
Standard$3,090.00$1,020.00
Complex$6,170.00$2,040.00

Land Use Review Application Fees Section 4-20-43 (b)

The Planning Board fee is refundable if the application is withdrawn prior to publication of the item on a Planning Board agenda.

1 The Annexation Feasibility Study Fee will be credited to the Annexation/Initial Zoning Fee if both applications are submitted within the same calendar year.
Type of ReviewInitial Application Fee – Includes three ReviewsPlanning Board
Administrative
Fee
Each Additional Review After Three
Annexation/Initial Zoning
Simple Single-Family Residential$5,000.00$1,580.00N/A
Standard$15,000.00$1,580.00N/A

Complex

Each additional Annex. Agreement

$20,000.00

$2,500.00

$1,580.00

N/A

N/A
Annexation Feasibility Study 1$2,100.00N/AN/A

Boulder Valley Comprehensive Plan

land use designation change outside the regular update process

$630.00N/AN/A
Concept Plan Review and Comment$8,915.00$1,580.00N/A
Minor Subdivision$1,750.00N/A$560.00
Outside City Utility Permit$7,630.00N/A$2,520.00
Affordable Housing Design Review Fee$3,420.00N/A$1,130.00
Preliminary Plat for a Subdivision$7,630.00N/A$2,520.00
Rezoning$22,890.00$1,580.00$7,550
Site Review
Height Modification Only$2,870.00N/A$950.00
Minor Amendment$3,420.00$1,580.00$1,130.00
Simple$7,630.00$1,580.00$2,520.00
Standard$14,480.00$1,580.00$4,780.00
Complex$40,580.00$1,580.00$13,390
Use Review
Standard$3,420.00$1,580.00$1,130.00
Non‑conforming use and
non‑standard lots and buildings
$2,870.00$1,580.00$950.00
Vacation for Streets and Alley Access Easements
Vacation Feasibility Study Only$4,000.00N/AN/A
Right-of-Way/Access Easement Vacation ($5,230 + $4,000)$9,230.00N/AN/A

Administrative Review Application Fees Section 4-20-43(b)

1 The Temporary Event Permit Fee may also apply upon Administrative Review approval. Contact a Project specialist for additional information.
All other conditional uses not specifically listed above: $1,090.00
Type of ReviewApplication Fee
Administrative Parking Deferral$337.00
Administrative Parking Reduction$605.00
Administrative Setback Variance$252.00
Administrative Solar Exception$252.00

Antenna for Wireless Telecommunication Services

Communications Facilities in Public Right-of-Way: $100 / facility (if more than 2)

$2,440.00
Change of Address$274.00
Change of Street Name

$1,580.00 plus

$131.00 per hour

Cooperative Housing License Fee 4-20-69(a)$645.00
Conditional Height Review$252.00
Day Care Center (less than fifty children)$1,090.00
Day Shelter$1,090.00
Detached Dwelling Unit with Two Kitchens$1,090.00
Extension of Development Approval – Staff Level$136.00
Fuel Service Station$1,090.00
Group Home Facility$505.00
Initial Property Addressing (outside the subdivision process)

$32.00 plus

$16.00 per unit

Landscape Standards Modification$274.00
Minor Modification to an Approved Discretionary Review Plan
Simple$168.00
Standard$757.00
Non‑Conforming Uses
Extension of One‑Year Expiration$274.00
Change of Use$274.00
Change of Use with Nonstandard Parking$274.00
Overnight Shelter$1,090.00
Type of ReviewApplication Fee
Parking Stall Requirements Modification$274.00
Public Utility Easement Modification$505.00
Religious Assembly$1,090.00
Rescission of Development Approval$547.00
Residential, Custodial, and Congregate Care Facilities$1,090.00
Sales or Rentals of Motor Vehicles as a conditional use$1,090.00
Selling from a Movable Structure, Vacant Lot, or Parking Lot (including Christmas tree sales) 1
Initial Application$252.00
Application Renewal$84.00
Site Access$274.00
Small Recycling Collection Facility$1,090.00
Substitution of Restaurant Use$168.00
Temporary Event1
Initial Application$252.00
Application Renewal$84.00
Two Detached Dwellings on a Single Lot$589.00
Zoning Confirmation for Beverage Licensing AuthorityN/A
Zoning Verification Letter$136.00

Other Development Review Application Fees

ApplicationSectionFee
Blue Line Amendment FeeSection 4-20-43(b)(1)$131.00 per hour of staff time required, minimum one hour.
Temporary Water Utility Connection Permit FeeSection 4-20-43(b)(8)$131.00 per hour of staff time required, minimum one hour.
Miscellaneous Plan Review Fee Section 4-20-43(d)(6)$131.00 per hour of staff time required, minimum one hour.

Historic Preservation Application Fees Section 4‑20‑37

ApplicationFee
Individual Landmark Fee$25.00
Historic District Designation Fee$75.00
State Tax Credit Fee
State Income Tax application, Part I (Proposed Work) $250 for review of Part 1 (minimum $5,000 qualifying costs necessary to apply for the credit)
State Income Tax application, Part 2 (Completed Work)
  • No additional charge for projects costing less than $15,000
  • $250 for projects costing between $15,000 and $49,999.99
  • $500 for projects costing between $50,000 and $99,999.99
  • $750 for projects costing $100,000 or more,

Fee for Demolition, Moving, or Removal of Non‑Landmarked Buildings over Fifty Years Old

In addition to the fee listed below, a Demolition Permit Fee or a House Moving Permit Fee is due after Historic Preservation approval and prior to commencing work.

Primary building built in or before 1939 $282.00
Primary building built in or after 1940 $51.00
Accessory building $51.00
On-site relocation$51.00
Off-site relocation$282.00
Public hearing required$1,504.00

Board of Zoning Adjustment Fees Sections 4‑20‑33, 4‑20‑47, 9-2-3(d)

TypeFee
Code Appeal Fee$106.00
Emergency Code Appeal Fee $210.00
Interpretation Request Fee $550.00
Variances Requiring Board of Zoning Adjustment Review (Section 9-2-3(d))*
*List of variances below
$550.00

Variances Requiring Board of Zoning Adjustment Review

  • Setback and separation requirements listed in Section 9-7-1
  • Building coverage requirements of Chapter 9-10
  • Spacing requirements for mobile homes of Section 9-7-10
  • Porch setback and size requirements of Section 9-7-4
  • Size and parking setback requirements for accessory units of Subsection 9-6-3(a)
  • Total cumulative building coverage requirements for accessory buildings of Section 9-7-8
  • Use of a mobile home for nonresidential purposes subject to the requirements of Subsection 10-12-6(b)
  • Parking requirements of Subsection 9-9-6(d)
  • Sign code variances and appeals as permitted by Subsection 9-9-21(s)
TypeFee
Solar Access Exception$550.00
Solar Access Permit $550.00

Rental Housing License Fees Section 4‑20‑18 and 4-20-38

Fee is due prior to issuance or renewal of a rental housing license. Licenses must be renewed every four years.

LicenseFee
Dwelling and/or Rooming Units$190.00 per license
Accessory Dwelling Units$190.00 per unit
Cooperative Housing Units$190.00 per unit
Investigative Inspection Fee $250.00 per inspection
SmartRegs Services Fee$100.00 per license
Short-Term Rental Business License$25.00
Short-Term Rental Annual Certification Fee $20.00

Administrative Fees

Sales tax also applies unless otherwise noted.

TypeFee
Maps
Fire Department Atlas$50.00
Parking Tokens
One roll of fifty tokens $12.50, no tax
One roll of fifty tokens for businesses within CAGID & UHGID$9.50, no tax
Photocopies
Letter, legal, or tabloid$0.25 / page (after 5 pages)
Large format$1.00 per square foot
Publications
Design and Construction Standards (includes CD)$75.00
Land Use Regulations$35.00
Research Services
Colorado Open Records Requests$35.00
Clerical Research Fee$37.00 per hour, no tax
Technical Research Fee $57.00 per hour, no tax
GIS Research Fee $76.00 per hour, no tax